Quantum
Alice & Bob Reports Cat-Qubit Progress in French Quantum Computing Program
Publication: The Quantum Insider
Author: Matt Swayne
Source published: 20/10/2026, 07:36:44 UTC
Briefing created: 20/10/2026, 07:50:47 UTC
Based on a feed excerpt; full article content has not been acquired. Source evidence retrieved 20/10/2026, 07:49:25 UTC.
Briefings
Alice & Bob successfully demonstrated core cat-qubit error-correction components on three hardware demonstrators during Phase 1 of the French PROQCIMA program. The team built integrated multi-block demonstrators using 6-qubit and 12-qubit chips, successfully testing noise-biased CNOT gates, measurement-and-reset sequences, and a non-Clifford gate. However, the measured logical error rate remained above the error-correction threshold, and while a digital twin identified longer coherence as a priority, the company has not yet achieved the consistent coherence required to operate below the threshold. The program aims for industrialization by 2032 with a 10-year competition structure.
Key points
- Alice & Bob demonstrated noise-biased CNOT gates between cat qubits on 6-qubit and 12-qubit chips, successfully testing measurement-and-reset sequences and a non-Clifford gate.
- The logical error rate across the full register remained above the error-correction threshold despite optimized error-correction cycles and a digital twin monitoring software.
Context
Alice & Bob is a leader in fault-tolerant quantum computing participating in the French government's PROQCIMA program, which aims to develop two universal quantum computers with 1,000 logical qubits by 2032. The program is a 10-year competition where five companies compete to build integrated multi-block demonstrators. This finding is significant as it represents the first Phase 1 results for the French quantum computing initiative, showing progress on cat-qubit architecture but highlighting the gap between demonstrated capabilities and the threshold for fault tolerance.
Limitations
Evidence covers only Phase 1 of PROQCIMA, which concluded in 2024. The logical error rate remained above the error-correction threshold, preventing the achievement of the threshold. The digital twin identified coherence as a priority but did not confirm the consistent coherence needed to operate below the threshold. The program's full 10-year timeline and final selection results beyond Phase 1 are not covered.
Generated by Bittrees-hosted qwen35-2b sha256:aaf42c8b7c3c on 20/10/2026, 07:50:47 UTC. Based on publisher-provided feed evidence; may not cover the full original article. Check the source for details.
View archived briefing on IPFS
bafybeigqwh37qevvbmrtytknnjnrqei4erost2ujgd4axczil2ggdmmmci