Space
NASA Conducts RS-25 Engine Test in Support of Future Artemis Missions
Publication: NASA
Author: LaToya Dean
Source published: 21/10/2026, 20:51:50 UTC
Briefing created: 21/10/2026, 21:06:17 UTC
Based on a feed excerpt; full article content has not been acquired. Source evidence retrieved 21/10/2026, 21:05:25 UTC.
Briefings
NASA conducted a hot fire test of RS-25 engine No. 10001 on Oct. 21, 2026, at the Fred Haise Test Stand near Bay St. Louis, Mississippi. The test lasted 500 seconds, matching the duration of an SLS rocket launch, and reached 111% power to validate thrust for Artemis missions. This test supports future Moonwalk simulations and ensures engine reliability for the Artemis program.
Key points
- Engine No. 10001 was tested for 500 seconds (8.33 minutes) at 111% power on Oct. 21, 2026.
- The test validated the thermal protection system and flight components for future Artemis missions.
Context
This test occurred at NASA's Stennis Space Center near Bay St. Louis, Mississippi, as part of preparations for next Moonwalk simulations. The test supports future Artemis missions by validating engine performance and thermal protection systems for the SLS rocket and Orion spacecraft.
Limitations
Evidence is limited to a single hot fire test of one engine; no data on total engine count, specific launch outcomes, or long-term reliability metrics are provided.
Generated by Bittrees-hosted qwen35-2b sha256:aaf42c8b7c3c on 21/10/2026, 21:06:17 UTC. Based on publisher-provided feed evidence; may not cover the full original article. Check the source for details.
View archived briefing on IPFS
bafybeiego2kxivuqtti3nzgz2zijkctabsslk65mtqommclsy5dnw6toui