ClimatePolitics
In Utah, a ‘hydrocarbon highway’ could run right through this petroglyph-filled canyon
Publication: Grist
Author: Leia Larsen
Source published: 18/11/2026, 09:15:00 UTC
Briefing created: 18/11/2026, 09:18:09 UTC
Based on a feed excerpt; full article content has not been acquired. Source evidence retrieved 18/11/2026, 09:15:24 UTC.
Briefings
A Utah red-rock canyon containing ancient petroglyphs and Pioneer-era inscriptions faces a proposed federal highway project. The Trump administration approved plans to blast a hydrocarbon highway through Nine Mile Canyon in 2026, bypassing public review processes. Environmental groups sued, claiming the project violated the Endangered Species Act and National Historic Preservation Act due to potential impacts on the Mexican spotted owl and historic sites. The BLM approved the project in April 2025 after a new development plan was finalized, despite earlier assessments warning of threats to cultural and scenic values.
Key points
- The Trump administration approved plans to blast a hydrocarbon highway through Nine Mile Canyon in eastern Utah in November 2026, connecting oil fields to rail-loading facilities.
- Environmental groups sued the Department of Interior and Bureau of Land Management, claiming the project violated the Endangered Species Act and National Historic Preservation Act due to potential impacts on the Mexican spotted owl and historic sites.
Context
Nine Mile Canyon runs about 46 miles and contains 47 historic sites, with 43 eligible for the National Register of Historic Places. The project could bring up to 500 heavy trucks through Nine Mile Canyon per day. The BLM began considering plans to realign Gate Canyon's winding dirt Wells Draw Road in 2015, after Duchesne County sought a more direct route from the oil fields in the Uinta Basin to the rail-loading facilities of Carbon County.
Limitations
The evidence covers a specific lawsuit filed in Utah's U.S. District Court against federal agencies. It does not include the federal government's response to the lawsuit, which was not filed. The timeline spans from 2015 to April 2025, with the lawsuit filed in 2026. The evidence does not provide details on the final environmental impact assessment results or the specific ecological data regarding the Mexican spotted owl population status.
Generated by Bittrees-hosted qwen35-2b sha256:aaf42c8b7c3c on 18/11/2026, 09:18:09 UTC. Based on publisher-provided feed evidence; may not cover the full original article. Check the source for details.
View archived briefing on IPFS
bafybeicihi6vdfhrybsiwnqietd22aiye3svpaza2w5t7hdycnujdvv37e