Portugal
Minimum Tagus Tail Still Unfulfilled
Publication: Observador - Últimas
Author: Agência Lusa
Source published: 01/10/2026, 10:37:15 UTC
Briefing created: 01/10/2026, 10:48:07 UTC
Based on a feed excerpt; full article content has not been acquired. Source evidence retrieved 01/10/2026, 10:46:24 UTC.
Briefings
ProTEJO and Zero claim the Tejo's minimum daily flow at Fratel reached 0.68 m3/s on August 21, representing about 6% of the agreed minimum. This figure was reported in a 2026 article, though the evidence is limited to a single date and does not confirm if this value meets the full minimum threshold or if the organization's broader claims are accurate.
Key points
- On August 21, 2026, the average daily inflow to Fratel was measured at 0.68 m3/s.
- This value corresponds to approximately 6% of the officially agreed minimum flow.
Context and limitations
The evidence covers only one specific date (August 21, 2026) and does not provide a full period of data or confirm if the 0.68 m3/s meets the complete minimum threshold.
Generated by Bittrees-hosted qwen35-2b sha256:aaf42c8b7c3c on 01/10/2026, 10:48:07 UTC. Based on publisher-provided feed evidence; may not cover the full original article. Check the source for details.
View archived briefing on IPFS
bafybeiasnznsblex3tlpeqn4tzhf4g34ho6hxur5jk25kznp3rary67z4y