Portugal
Train of Torres Vedras to the Queen's Caldas returns on November 15
Publication: ECO
Author: Alexandre Batista
Source published: 02/11/2026, 13:39:57 UTC
Briefing created: 26/11/2026, 15:35:52 UTC
Based on a feed excerpt; full article content has not been acquired. Source evidence retrieved 02/11/2026, 13:41:24 UTC.
Briefings
The Portuguese Ministry of Infrastructure and Housing announced the resumption of the train service between Torres Vedras and the Caldas da Rainha on November 15, 2026, following stabilization work after the January 2026 storm Kristin.
Key points
- The train service between Torres Vedras and the Caldas da Rainha is scheduled to resume on November 15, 2026, after stabilization work completed in February and March 2026.
- The reconnection between Mira Sintra-Meleças and Torres Vedras remains unconfirmed as of November 2026, with only bus services planned to replace the train.
Context
The resumption follows the 'storm of storms' period involving the January 2026 storm Kristin and subsequent infrastructure repairs. The service is part of the Linha do Oeste line, with the Caldas da Rainha to Louriçal section fully operational since March 16, 2026.
Limitations
The specific date for the reconnection between Mira Sintra-Meleças and Torres Vedras is not confirmed; the service is currently being replaced by bus services.
Generated by Bittrees-hosted qwen35-2b sha256:aaf42c8b7c3c on 26/11/2026, 15:35:52 UTC. Based on publisher-provided feed evidence; may not cover the full original article. Check the source for details.
View archived briefing on IPFS
bafybeighibfha45ljhmbxeunde6krrmh3sfjldyxzjcyos5qjzwxik7bze